Drawing for GREEN STRUT STEEL MEETS SUSTAINBILITY

USPTO serial 99638552

GREEN STRUT STEEL MEETS SUSTAINBILITY

Reviewed by CopyMark Law Group

Status 661
Filing date
Status date
Registration date
—
Examiner
CORWIN, KEVIN SCOTT
Law office
TMO LAW OFFICE 112

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GREEN STRUT STEEL MEETS SUSTAINBILITY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Justin King

Justin King WPAT, PC8230 Boone Blvd. suite 405Vienna, VA 22182United States

Goods and services

ClassDescriptionStatusFirst use
006Metal prefabricated elements for building, namely, Beams of Metal, Braces of metal for handling loads, porches (structures) of metal; reinforcing materials of metal for concrete; Modular units of metal for constructing prefabricated buildings; namely doors of metal, door panels of metal; Platforms, prefabricated, of metal; Prefabricated buildings components made of metal; namely ducts of metal for ventilating and air-conditioning installations; Prefabricated buildings made substantially of metal; Prefabricated extensions of metal for buildings, all for use in Mechanical, Electrical, Plumbing and Industrial Installations; namely ducts of metal, for central heating installations / pipes of metal, for central heating installations / ducts and pipes of metal for central heating installations; Steel supports and framing systems used in Mechanical, Electrical, and Plumbing (MEP) installations and industrial setups; namely mouldings of metal for building; Prefabricated metal bridges; Prefabricated metal building structures; namely Prefabricated metal platforms; Prefabricated partition walls of metal; Prefabricated platforms of metal; Structures of metal for use as prefabricated building foundations; namely reinforcing materials, of metal, for concrete; Shoring struts of metal, all for use to withstand seismic stresses and enhanced structural stability for protection against earthquakes; Metal support and bracing components for reinforcing modular structures and improving structural safety, including for earthquake-resistant construction, namely, construction elements made of metal in the nature of braces; Products made of metal for use in building and construction; namely sheets and plates of metal; Prefabricated elements of metal for building; namely roofing tiles of metalACTIVE—
019Modular prefabricated building units of non-metallic materials for the construction of buildings, namely, beams, not of metal/girders, not of metal; reinforcing materials, not of metal, for building; Modular structural units, not of metal, for the construction of prefabricated buildings, namely, ducts, not of metal, for ventilating and air-conditioning installations; Non-metallic prefabricated building components, namely, mouldings, not of metal, for building; staircases, not of metal; Non-metallic prefabricated building elements, namely door panels, not of metal; claddings, not of metal, for building; Non-metallic prefabricated building elements for on site assembly, namely platforms, prefabricated, not of metal; Non-metallic prefabricated buildings; Non-metallic prefabricated partition walls; Non-metallic shoring struts; Racking structures of non-metallic materials for supporting cables, namely, brackets, not of metal, for building, signalling panels, non-luminous and non-mechanical, not of metalACTIVE—
040Custom manufacture of prefabricated buildings, namely, custom manufacture of structural components of prefabricated buildings, with said services not including the final construction of permanent structures; Custom manufacture of prefabricated construction elements for use in the assembly of prefabricated buildings; Custom manufacture of Modular prefabricated building units for use in the asembly of prefabricated buildings; Custom manufacture of Modular prefabricated building components, namely mechanical, electrical and plumbing (MEP) installations for the construction of buildings; Custom manufacturing of modular components for modular buildings; Metal fabrication services for others, namely, custom fabrication of steel construction elements; Custom steel rolling and fabrication to the order and specification of others; Custom Metal fabrication and finishing services for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 25, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 25, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 25, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 4, 2026DOCKASSIGNED TO EXAMINER—
Jun 4, 2026MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 3, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 11, 2026TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Feb 11, 2026PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Feb 6, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 6, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance