Drawing for SUNPOWER

USPTO serial 99677882

SUNPOWER

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
YAO, GRETTA
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with SUNPOWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*

Plus Government fees of $450

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Daniel C. Neustadt

Daniel C. Neustadt HOLLAND & KNIGHT LLP800 17th Street NW, Suite 1100Washington, DC 20006United States

Goods and services

ClassDescriptionStatusFirst use
006Mounting systems for solar collectors comprised of structural supports and mounting rails, made of metal, for rooftop stabilization and stabilization on the ground, solar collector supports made of metal, and clamps made of metal; solar panel mounts made of metalACTIVE—
009Photovoltaic cells; modules, namely, photovoltaic modules and solar cell modules; panels, namely, photovoltaic panels and solar cell panels; solar batteries; solar cells; solar concentrators; photovoltaic solar-thermal hybrid modules; electronic sensors for measuring solar radiation; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members and photovoltaic cladding panels; silicon wafers; solar wafers; inverters; photovoltaic inverters; solar inverters; converters; photovoltaic converters; solar energy converters; photovoltaic panel mounting system, comprised of solar panels, connectors, and also including mounting rails, and a mounting structure, for use in providing heating and cooling load reduction and generating electricity, all sold as a unit; computer software and computer hardware for use in energy monitoring and energy management and for use in tracking energy usage; software for inventory management; Power electronics, namely, power line conditioners, power optimizers, namely, electronic devices for maximizing energy from photovoltaic modules, voltage regulatorsACTIVE—
019Roofing, not of metal, incorporating solar cells; mounting systems for solar collectors comprised of structural supports not of metal, attachment features, namely, mounting rails not of metal, for rooftop stabilization and beautification, and for stabilization on the ground; solar collector supports not of metal, and clamps, not of metal; solar panel rails not of metal for rooftop mountingACTIVE—
035Energy usage management; energy usage management information services; home energy assessment services for the purpose of determining energy efficiency or usage management; information in the field of energy efficiency; business consulting and advisory services in the field of energy efficiency; consultation in the field of energy efficiencyACTIVE—
036Financing services, namely, solar electric system leases, solar power purchase agreements, and financing loans for the purchase and installation of solar power systemsACTIVE—
037Installation, cleaning, repair, and maintenance of solar energy based power systems and alternative energy products for residential and commercial use; Installation, repair, and maintenance of solar energy systems, solar collectors and solar heat collection panels; installation of facilities to produce solar energy, installation of ground-mounted and roof-mounted solar panel systemsACTIVE—
042Technical planning of solar energy based power plants; Technical planning of photovoltaic and solar collector installations; Technical planning, design and development of solar photovoltaic systems; Technology consultation in the field of photovoltaic cells, photovoltaic modules and solar cell modules; Remote monitoring, metering and data analysis of energy usage and energy management systems; energy usage monitoring in the nature of data analysis; solar engineering services; temporary use of non-downloadable computer software for use in energy monitoring and energy management and for use in tracking energy usageACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Sep 29, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 4, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 4, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 29, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 7, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 30, 2026DOCKASSIGNED TO EXAMINER—
Jun 29, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 2, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 2, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance