Drawing for THE HIGHEST PERFORMING NATIONAL CONTRACTOR OF EXCELLENCE

USPTO serial 99682894

THE HIGHEST PERFORMING NATIONAL CONTRACTOR OF EXCELLENCE

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
WATSON, BRIDGET ANNE
Law office
TMO LAW OFFICE 128

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with THE HIGHEST PERFORMING NATIONAL CONTRACTOR OF EXCELLENCE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

E. Victor Indiano

E. Victor Indiano INDIANO LAW GROUP, LLC9795 Crosspoint BlvdSuite 185Indianapolis, IN 46256

Goods and services

ClassDescriptionStatusFirst use
037Electrical contractor services; Comprehensive preventative maintenance service for electrical systems; Construction supervision; Construction of commercial, industrial, and institutional buildings; Construction and repair of buildings; Consultancy services relating to the construction of buildings; Installation, maintenance and repair of computer servers; Electrical repairs, maintenance, and installation of electrical wiring, outlets, light fixtures, and electrical panels; Installation, maintenance and repair of Ethernet and wireless networking hardware; Installation of computer networking hardware; Installation, maintenance and repair of lighting apparatus; Installation, maintenance and repair of apparatus for supplying electricity; Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Installation of data processing apparatus; Installation, maintenance and repair of telecommunications equipment; Repair or maintenance of power distribution or control machines and apparatus; Repair or maintenance of electric lighting apparatus; Installation, maintenance and repair of apparatus for distributing electricity; Installation of utilities in the nature of electrical, data, conduit, wiring, communication and information technology in construction sites; Mechanical contractor services; Installation, repair and replacement of electrical equipment, electrical infrastructure, lighting, alternative energy products, lighting equipment products, data, communication, and information technology equipment, electrical equipment and electrical systems, skids / duct bank assemblies, electrical modules, overhead pipe racks, pipe assemblies, electrical panels, power wall assemblies, electrical packages for rooms, kits containing various items for use with electrical equipment and systems; Installation, maintenance and repair of electrical equipment, conduit, wiring, electrical infrastructure, lighting, alternative energy products, lighting equipment products, data, communication, and information technology equipment, electrical equipment and electrical systems, skids / duct bank assemblies, electrical modules, overhead pipe racks, pipe assemblies, electrical panels, power wall assemblies, electrical packages for rooms, kits containing various items for use with electrical equipment and systems,; Assembly services relating to the installation of electrical equipment, conduit, wiring, electrical infrastructure, lighting, alternative energy products, lighting equipment products, data, communication, and information technology equipment, electrical equipment and electrical systems, skids / duct bank assemblies, electrical modules, overhead pipe racks, pipe assemblies, electrical panels, power wall assemblies, electrical packages for rooms, kits containing various items for use with electrical equipment and systems,ACTIVEOct 11, 2015
040Custom construction of electrical equipment and products for use with electrical equipment, skids, duct bank assemblies, electrical modules, overhead pipe racks, pipe assemblies, conduit, wiring assemblies, electrical panels, power wall assemblies, electrical packages for rooms, and kits containing various items for use with electrical equipment and systems,ACTIVEOct 11, 2015
041Arranging and conducting of training courses in the field of electrical contracting services, and the construction, maintenence, and repair of buildings and electrical equipmentACTIVEOct 11, 2015
042Industrial design; Engineering design services; Custom design and engineering of alternative energy products ,utility infrastructure , lighting equipment products, data, communication, and information technology equipmentACTIVEOct 11, 2015

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 7, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Oct 7, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jul 8, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 8, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 8, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 2, 2026DOCKASSIGNED TO EXAMINER—
Jun 30, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 4, 2026NWAPNEW APPLICATION ENTERED—
Mar 4, 2026MAFRAPPLICATION FILING RECEIPT MAILED—

Frequently asked questions

Related guidance