Drawing for GUY M. TURNER, INC. MOVING ENGINEERS

USPTO serial 99718995

GUY M. TURNER, INC. MOVING ENGINEERS

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
JACKSON, STEVEN W
Law office
TMEG LAW OFFICE 107

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with GUY M. TURNER, INC. MOVING ENGINEERS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Laura Miller

Laura Miller Kilpatrick Townsend & Stockton LLP1001 W. Fourth StreetWinston-Salem, NC 27101United States

Goods and services

ClassDescriptionStatusFirst use
035Provision of crane operators and maintenance staff for the operation, maintenance, refurbishment and modification of cranes and lifting equipmentACTIVE—
037Leasing and rental of cranes, hoists, hoisting equipment, and lifting equipment; Millwright services, namely, installation, erection, maintenance, and repair of industrial and mechanical equipment and machines; Maintenance and repair of cranes, hoists, hoisting equipment, and lifting equipment; Advisory and design services relating to lift plans and designs; Hoisting services; Lifting services for heavy equipment; Gantry lifting services; Skidding services for heavy equipment; Structural lifting services; On-site lifting and rigging services; Transformer lifting and setting services; Providing crane and rigging services for heavy lifting; Crane assembly services and crane disassembly services; Operation of cranes, rigging, construction hoists, lifting equipment, heavy lifting installations and heavy transport equipment; Project management services for lifting and rigging projects; Consultation relating to installation, maintenance and repair of cranes, hoists, and lifting equipment; Installation, relocation, moving, setting and dismantling of machinery and heavy equipment; Machinery installation, maintenance and repair; Installation, maintenance, and repair of cranes, hoists, and lifting equipmentACTIVE—
039Crane rental and leasing for loading and unloading purposes; Crane rental services for transportation purposes; Truck hauling; Packing, crating and warehousing services; Transport and delivery of goods; Freight transportation by truck; Truck transport; Transport of oversized items by truck; Unloading cargo; Providing heavy haul, rigging, specialized movement and transportation of heavy equipment; Transport of heavy haul goods by truck; Warehousing services; Transportation and hauling services, namely, the furnishing of transportation equipment for the purpose of heavy hauling; Storage of industrial machinery and heavy equipment; Heavy haul transportation services; Cargo lifting services, namely, jack-and-slide services; Specialty rigging and industrial moving and transportation services, namely, transportation and transportation featuring heavy lifting of large machinery, equipment, structures, and structural components, utilizing specialized vehicles, trailers, skidding systems, jacking systems, dollies and cranes; Providing advice and information in relation to transportation and transportation requirements for lifting and transporting heavy and oversized goods; Freight brokerage services; Physical relocation services of factories and plants for others; Heavy rigging in the nature of transport of goods for others using heavy rigging; Transportation of machinery for others to construction job sites; Storage of industrial plant machinery and heavy equipment; Transportation and logistics planning and consulting services in the field of heavy haul transportation; Transportation permit and route planning servicesACTIVE—
042Engineering and design services of lifts; Engineering and design services for heavy lifting installations; Lift planning in the nature of technological planning in the field of rigging engineering and crane selection; Lift planning for heavy equipment operationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (GNRN): A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

DateCodeEventWhat it means
Aug 14, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 14, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 14, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 7, 2026DOCKASSIGNED TO EXAMINER—
Aug 6, 2026MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 6, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 23, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 23, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance