Drawing for ALFANAR

USPTO serial 99734834

ALFANAR

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
Examiner
FLETCHER, TRACY L
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with ALFANAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael S. Hargis

Michael S. Hargis Stites & Harbison, PLLC250 West Main Street, Suite 2300Lexington, KY 40507United States

Goods and services

ClassDescriptionStatusFirst use
004Hydrogen fuel; Electrical energy; Electrical energy from renewable sources; Renewable fuels; Renewable natural gas; Fuels; Fuels based on renewable raw materialsACTIVE
007Wind turbines; Generators for wind turbines; Motors, gears and drives for orientating solar panels; Electric generators and related equipment, namely, automatic standby electric generator sets; Electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sourcesACTIVE
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Wire connectors; Electricity distribution consoles; Electricity limiters; Renewable battery system to provide backup power; Photovoltaic solar panels for the production of electricity; Batteries for energy storage; Wind turbine controllerACTIVE
037Building construction; Building repair; Building maintenance; Demolition of buildings; Installation of renewable energy generation equipment; Construction of wind power plants; Maintenance and repair of wind power plants; Construction of geothermal power plants; Construction of power plants; Maintenance of power plants; Assembly services relating to the installation of power generation systems; Installation, maintenance and repair of solar energy based power plants; Construction of water supply installations; Construction of energy and power generating installations; Installation, maintenance and repair of solar collectors and photovoltaic modules; Installation of gas and water pipelines; Plumbing and gas and water installation; Installation, maintenance and repair of water supply apparatus; Pipeline construction and maintenance; Repair or maintenance of power distribution or control machines and apparatus; Installation, maintenance and repair of power lines; Installation of power generating apparatus; Installation, maintenance and repair of apparatus for distributing electricity; Installation, maintenance and repair of apparatus for generating electricity; Installation, maintenance and repair of apparatus for supplying electricity; Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Providing information relating to the construction, repair and maintenance of buildings; Construction of civil engineering structures; Construction supervision; Real estate development and construction of commercial, residential and hotel property; Machinery retrofit and conversion services; Construction of steel structures; Advisory services relating to building construction; Advisory services relating to building demolition; Consulting services in the field of construction of wind energy facilities; Maintenance and repair of power shift transmissions; Building construction supervision services for real estate projectsACTIVE
039Distribution of energy; Distribution of renewable energy; Leasing the use of power lines to third parties for the transmission of electricity; Providing online information, news, and commentary in the field of energy distributionACTIVE
040Production of electrical energy from renewable sources; Generation of electricity; Generating of electricity from photovoltaic solar energy; Generation of electricity from wind energy; Generation of electricity from geothermal energy; Generation of energy; Generation of energy from renewable sources; Leasing of energy generating equipment; Leasing of renewable energy generation equipment; Water treatment and purification; Air purification and treatment of water; Clean energy production from hydrogen; Consulting services in the field of all types of water treatmentACTIVE
042Engineering services; Engineering services in the field of energy supply systems; Engineering services in the field of energy efficiency; Engineering services in the field of energy technology; Engineering design services; Surveying; Geological prospecting; Construction drafting; Electricity and natural gas services, namely, meter data management and analysis; Electricity and natural gas services, namely, metering; Material testing; Geological research; Environmental engineering, testing and inspection services; Quality control of services; Energy auditing; Water analysis; Water quality control services; Calibration services; Design of pipelines; Pipeline inspection services; Design of mechanical, electromechanical and optoelectronic apparatus and instruments; Research and development in the field of energy; Research and development in the field of photovoltaic solar energy; Research and development in the field of hydroelectric energy; Research and development in the field of wind energy; Research and development in the field of geothermal energy; Research and development of technology in the field of oil and gas mining, electricity and energy supply systems; Conducting wellbore survey services for the oil and gas, energy, mining, environmental and construction industries; Consulting services in the fields of energy measurement to improve energy efficiency; Technological consulting services in the field of alternative energy generation; Consulting services in the field of environmental assessment and planning; Technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; Technological planning and consulting services in the field of renewable energy resources; Consulting in the field of engineering; Providing technology information relating to oil and gas industry; Metering and monitoring electric power consumption by third parties for electric power providers; Technological planning and consulting services in the field of electricity generation; Technological planning and consulting services in the field of energy production; Monitoring the development, construction, and operation of renewable energy supply systems for quality control purposesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 2, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Aug 31, 2026ALIEASSIGNED TO LIE
Aug 28, 2026PARITEAS VOLUNTARY AMENDMENT RECEIVED
Aug 22, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 21, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 21, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 19, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 19, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 19, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 15, 2026DOCKASSIGNED TO EXAMINER
Aug 14, 2026MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED
Aug 14, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 31, 2026NWAPNEW APPLICATION ENTERED
Mar 31, 2026MAFRAPPLICATION FILING RECEIPT MAILED

Frequently asked questions

Related guidance