Drawing for LFG

USPTO serial 99804290

LFG

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
THOMA, GABRIELLE M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with LFG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Eleanor M. Yost

Eleanor M. Yost Carlton Fields, P.A.P.O. Box 3239Attn: IP DeptTampa, FL 33601

Goods and services

ClassDescriptionStatusFirst use
037On-site repair or maintenance of power distribution or control machines and apparatus, namely, on-site repair or maintenance of electrical power distribution equipment; assembly services relating to the installation of UL-listed electrical power distribution equipment using components from third-party manufacturersACTIVEMar 24, 2026
040Custom manufacturing of electrical power distribution equipment for others to project-specific specifications, namely, switchboards, panelboards, transformers, busways, bus ducts, electrical enclosures, bussed troughs, variable frequency drives, and medium-voltage switchgear; metal fabrication and finishing services for others, namely, precision cutting and finishing of metal components for electrical power distribution equipment; powder coating of metal components for electrical power distribution equipment; custom fabrication of UL-listed electrical power distribution equipment for others through fabrication and assembly using components from third-party manufacturersACTIVEMar 24, 2026
042Engineering design services for electrical power distribution equipment, namely, switchboard design, 3D modeling, and specification engineering performed by licensed Professional Engineers for construction projects; providing quality assurance services in the field of electrical power distribution equipment, namely, pre-shipment review of 3D models, hands-on inspection, and installer-verification testing of custom-manufactured switchboards, panelboards, and electrical power distribution equipment to assess field readinessACTIVEMar 24, 2026

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 27, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 27, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 21, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 25, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 25, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 25, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Sep 25, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 25, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 14, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 14, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 9, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 8, 2026DOCKASSIGNED TO EXAMINER—
Sep 3, 2026MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Sep 3, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 5, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
May 5, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance