Drawing for CORE POWER

USPTO serial 99810984

CORE POWER

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
QUEEN, ESTHER FELICIA
Law office
TMO LAW OFFICE 111

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with CORE POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stacy J. Grossman

Stacy J. Grossman SGIP500 Mamaroneck Ave, Suite 320Harrison, NY 10528United States

Goods and services

ClassDescriptionStatusFirst use
007Nuclear power plant machinery; machinery for the generation of electricity using nuclear energy; floating nuclear power plant machinery; reactors for maritime and offshore power generation; nuclear power generation modules; machinery and mechanical installations for offshore and maritime energy infrastructure; turbines, generators and power conversion machinery for nuclear power plants and floating nuclear power plants; pumps, compressors and valves as parts of nuclear power plant machinery and floating nuclear power plant machinery; ship‑based power generation machinery; modular power generation machines; structural parts and fittings for all the aforesaid machinesACTIVE—
009Apparatus and instruments for nuclear power generation; electronic control units for power generation installations, namely, nuclear power plants and floating nuclear power plants; sensors, detectors and monitoring devices for use in energy and power generation systems, namely, nuclear power plants and floating nuclear power plants; electrical apparatus for regulating, controlling and distributing electricity by nuclear power plants and floating nuclear power plants; recorded and downloadable computer software for the operation, monitoring, control, simulation and optimisation of power generation systems, namely, nuclear power plants and floating nuclear power plants; control, monitoring, measuring and safety apparatus for nuclear reactors; software and digital platforms for managing nuclear reactors, floating power plants and maritime energy installations; data processing equipment; digital twins and simulation software for energy infrastructure; computer software and downloadable computer software for use in proprietary digital platforms for the management, monitoring, control, operation and optimisation of nuclear power plants, floating nuclear power plants and civil maritime nuclear propulsion systems; software for energy management and power plant performance monitoring; software for condition monitoring, predictive maintenance and fault detection in power generation systems; software for asset management, fleet management and operational management of maritime and offshore energy infrastructure; parts and fittings for all the aforesaid goodsACTIVE—
037Construction, installation, commissioning and maintenance of floating nuclear power plants; construction and installation of offshore and maritime energy infrastructure; construction, installation and maintenance of barge‑based and ship‑based power generation facilities; installation, maintenance and repair of machinery and equipment for power generation and energy equipment, namely, nuclear power plants and floating nuclear power plants; maintenance and repair of nuclear reactor systems and components; operational support services, namely maintenance, repair and servicing of components forming part of nuclear power generation systems; maintenance and servicing of power conversion systems, turbines, generators and ancillary equipment for nuclear power plants and floating nuclear power plants; maintenance and repair of electrical, mechanical and thermal systems forming part of power generation installations, namely, nuclear power plants and floating nuclear power plants; inspection, testing and fault diagnosis of power generation installationsACTIVE—
039Distribution and supply of electricity generated by nuclear power plants and floating nuclear power plants; operation of floating nuclear power plants for the purpose of supplying energy; transport, towing and positioning of floating power plants, power barges and power generation installations; distribution of energy generated by nuclear power plants and floating nuclear power plants to ports, terminals, coastal facilities, offshore installations and industrial infrastructure; operation of nuclear‑powered ships for the transportation of goods; logistics services relating to the transportation and deployment of floating power plants and maritime energy infrastructure; storage and transport of energy generation equipmentACTIVE—
040Production of electricity by nuclear power plants and floating nuclear power plants; operation of nuclear power plants and floating nuclear power plants for the production of energy; energy production services for ports, terminals, coastal facilities and offshore installations using nuclear power plants and floating nuclear power plants; generation of electrical power for industrial, commercial, maritime and offshore use; production of energy using advanced nuclear technologies; generation of electrical power using nuclear reactors; generation of electrical power by floating nuclear power plants; production of energy using nuclear power plants and floating nuclear power plants for use in maritime and offshore infrastructureACTIVE—
042Engineering and technological services relating to nuclear energy and advanced nuclear technologies; design, development and engineering of nuclear power plants and floating nuclear power plants; design and development of maritime and offshore nuclear energy infrastructure; naval architecture and marine engineering services relating to floating power generation installations; engineering design of barge‑based and ship‑based power generation systems; research, development and testing of nuclear reactor systems and components; technological consultancy in the field of nuclear engineering, maritime nuclear technology and advanced energy systems; technical consultancy relating to the design, deployment and integration of power generation installations, namely, nuclear power plants and floating nuclear power plants; feasibility studies, technical assessments and risk assessments relating to nuclear power plants and offshore energy infrastructure; design and development of digital models and simulations of power generation installations; system integration design services for power generation and energy infrastructure, namely nuclear power plants and floating nuclear power plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (GNRN): A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

DateCodeEventWhat it means
Oct 5, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 5, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 5, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2026DOCKASSIGNED TO EXAMINER—
Sep 8, 2026MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Sep 8, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 8, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
May 8, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance