USPTO serial 99822926
BLUECORE ENERGY
Reviewed by CopyMark Law Group
Status 681
- Filing date
- Status date
- Registration date
- —
- Examiner
- HANNAH, JESSICA L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BLUECORE ENERGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Los Angeles, CA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Humza Arshad
Humza Arshad HWA ESQ., P.C. d/b/a: Get Trademark Secure1325 Franklin Avenue, Suite 210Garden City, NY 11530United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Boat engines, and structural and replacement parts therefor; Engines and motors for model vehicles, aircraft and boats, and structural and replacement parts therefor; Electrical and electronic apparatus and equipment, all for use in generating energy obtained from nuclear energy sources, and structural and replacement parts therefor; Machines and mechanical apparatus for use in nuclear energy generation, namely, steam turbines for electric power generation in nuclear power plants, electricity generators, turbine-generator sets, pumps, namely, reactor coolant pumps and feedwater pumps, steam condensers being parts of machines, control rod drive mechanisms being parts of machines, and nuclear fuel handling machines, and structural and replacement parts therefor | ACTIVE | — |
| 011 | Nuclear generators; Nuclear reactors; Installations for processing nuclear fuel in the nature of nuclear generators, nuclear reactors, and nuclear convertors; Reactor vessels; Nuclear installations in the nature of nuclear generators, nuclear reactors and nuclear convertors | ACTIVE | — |
| 037 | Installation, maintenance, and repair of maritime nuclear engines and equipment using nuclear technology; Consultation, advisory and informational services related thereto | ACTIVE | — |
| 040 | Consultation services in the field of nuclear energy production | ACTIVE | — |
| 042 | Research and development in the field of nuclear energy; Research in the field of nuclear energy power generation technology | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Bluecore Energy Inc.
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BLUECORE ENERGY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 25, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 24, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 23, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 23, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2026 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2026 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 14, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 31, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 14, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 14, 2026 | NWAP | NEW APPLICATION ENTERED | — |