Drawing for ACCELEVATION

USPTO serial 99869592

ACCELEVATION

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
STEINPFAD, SARAH E
Law office
TMO LAW OFFICE 120

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with ACCELEVATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kristin H. Hardy

Kristin H. Hardy Taft Stettinius & Hollister LLP115 Madison Street, Suite 700Dayton, OH 45402United States

Goods and services

ClassDescriptionStatusFirst use
009Electrical power distribution units; remote power panels for distributing electrical power across server racks and other electrical loads; electrical switchboards; electrical switchgear in the nature of apparatus for controlling, protecting, and isolating electrical circuits; panelboards for distributing electrical power within buildings; automatic transfer switches for switching electrical loads between primary and backup power sources; electrical tap boxes for interfacing a building's electrical busway system with connected equipment; power skids, namely, pre-assembled, portable electrical power distribution assemblies integrating transformers, circuit breakers, and metering devices; electrical distribution panels; electrical branch circuit monitoring systems comprised of electrical sensors, monitors, and controllers for monitoring electrical load; circuit breakers; electrical transformers; electrical connectors, plugs, switches, and outlets used with electrical power distribution equipmentACTIVEJan 11, 2021
037Construction and building of data center facilities; consulting services in the field of construction and building of data center facilities; construction and installation services, namely, installation of data center infrastructure, including installation of server racks and cabinets, security cages and enclosures, hot aisle and cold aisle containment systems, cable management systems, overhead cable trays, raised flooring systems, and power distribution units in data centers and computing facilities; construction project management services in the field of data center white space infrastructure build-out and fit-up; Installation, maintenance, and repair of electrical power distribution units, remote power panels, panelboards, switchboards, switchgear, automatic transfer switches, tap boxes, and power skids; building of electrical power distribution assemblies, namely, power distribution units, remote power panels, and power skids; installation and maintenance of electrical power systems for industrial and commercial facilitiesACTIVEJan 11, 2021
040Custom fabrication services, namely, custom manufacturing of data center infrastructure components to the order and specification of others, including security cages and enclosures, server rack structures and cabinets, hot and cold aisle containment panels and end caps, cable management systems and trays, and raised floor panels; metal fabrication services for the data center and industrial technology industries; Custom manufacturing of electrical power distribution units, remote power panels, panelboards, switchboards, switchgear, automatic transfer switches, tap boxes, and power skids to the specifications of others; contract manufacturing services in the field of electrical power distribution equipmentACTIVEJan 11, 2021
042Design of data center facilities; planning and layout design services for data center facilities; consulting services in the field of design, planning and layout design for data center facilities; engineering services in the field of data center infrastructure, namely, design and engineering of data center white space layouts, power and cooling infrastructure configurations, aisle containment systems, structured cabling pathways, and server rack and cabinet floor plans; technical consulting services in the field of data center infrastructure design and optimization; project planning services in the field of data center build-out; providing technical assessments and recommendations for data center infrastructure upgrades and capacity expansionACTIVEJan 11, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (GNRN): A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

DateCodeEventWhat it means
Oct 22, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 17, 2026DOCKASSIGNED TO EXAMINER—
Oct 16, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 15, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 15, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 15, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 6, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 6, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance