Drawing for AMPERA

USPTO serial 99895879

AMPERA

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
CHISOLM, KEVON
Law office
TMEG LAW OFFICE 103

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with AMPERA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John P. McCormick

John P. McCormick FISH & RICHARDSON P.C.P.O. Box 1022Minneapolis, MN 55440-1022United States

Goods and services

ClassDescriptionStatusFirst use
007Power generation equipment; turbines; generators; energy conversion systems; industrial machinery; additive manufacturing systems; reactor manufacturing equipment; Electric power generators using waste heatACTIVE—
009Software; control systems; digital monitoring systems; autonomous operating systems; AI-enabled software; downloadable software for energy systems, nuclear systems, manufacturing systems, and industrial processesACTIVE—
011Nuclear reactors; generators; reactors; reactor components; heat exchangers; energy generation systems; power plants; thermal energy systems; cooling systems; microreactors and related installationsACTIVE—
037Construction, installation, maintenance, commissioning, and servicing services; Construction, installation, maintenance, commissioning, and servicing of energy generation facilities, nuclear facilities, power plants, manufacturing systems, and industrial equipmentACTIVE—
040Energy production; electricity generation; fuel processing; material processing; additive manufacturing services; advanced manufacturing servicesACTIVE—
042Scientific research; engineering design; reactor design; energy system design; nuclear engineering; AI development; digital twin development; hardware and software design, development, implementation, and maintenance; simulation and modeling services; technology consulting; research and development; software; engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (GNRN): A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

DateCodeEventWhat it means
Oct 29, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 29, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 29, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 28, 2026DOCKASSIGNED TO EXAMINER—
Oct 26, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 19, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 19, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance